Painting & Ceilings
Contemporary Wall & Slatted Ceiling Restoration
Level 5 acoustic plaster skim, integrated warm coving LED, and custom oak millwork layout.
Location
Residential Property
Scope
Full Scope
Timeline
18 Working Days
Assigned Lead
Lead Project Director
The Case Study Brief
Level 5 acoustic plaster skim, integrated warm coving LED, and custom oak millwork layout.
Coordinated Trades & Applied Disciplines
Diagnostic Challenges & Coordinated Solutions
The Challenge
Micro-vibrations, uneven legacy coats, and substrate settling fissures across joint planes required specialized isolation and anchoring before surface coatings.
The Uni Finish Solution
Channeled existing seams, stitched joint anchors with high-tensile fiberglass mesh, applied flexible elastomeric putty, and isolated ceiling rafts with precision level checks.
Transformation Split View
Drag Slider to Compare
BeforeBefore: Diagnostic Substrate
AfterAfter: Level-5 Optical Flatness
Single Accountability
Coordinated Project Management
Every trade dependency in this project was mapped directly to a single daily supervisor, ensuring dust control and milestone compliance.
Start Your Home Project
Inspired by This Transformation?
Schedule a consultation with our lead supervisor to discuss your property requirements.