Waterproofing

Terrace Waterproofing & Drainage Optimization

Slope correction and elastomeric thermal barrier membrane over exposed terrace with drainage testing.

Terrace Waterproofing & Drainage Optimization
Location
Residential Property
Scope
Full Scope
Timeline
18 Working Days
Assigned Lead
Lead Project Director

The Case Study Brief

Slope correction and elastomeric thermal barrier membrane over exposed terrace with drainage testing.

Coordinated Trades & Applied Disciplines

Elastomeric PUSlope CorrectionDrainage

Diagnostic Challenges & Coordinated Solutions

The Challenge

Micro-vibrations, uneven legacy coats, and substrate settling fissures across joint planes required specialized isolation and anchoring before surface coatings.

The Uni Finish Solution

Channeled existing seams, stitched joint anchors with high-tensile fiberglass mesh, applied flexible elastomeric putty, and isolated ceiling rafts with precision level checks.

Transformation Split View

Drag Slider to Compare
After: Level-5 Optical Flatness
Before: Diagnostic Substrate
Before
After
Single Accountability

Coordinated Project Management

Every trade dependency in this project was mapped directly to a single daily supervisor, ensuring dust control and milestone compliance.

Next Case Study
Living Room Restoration & Level-5 Skim Coating
Start Your Home Project

Inspired by This Transformation?

Schedule a consultation with our lead supervisor to discuss your property requirements.